© 2020 by Red Barn Engineering, Inc.

Eastside Prep School - TALI Hall

This is the second building on the Eastside Preparatory campus where a member of the  Red Barn Staff has been the lead civil engineer/project manager. The project included the design and construction of a new performing arts and theater building.   In addition to providing civil services, Red Barn offered its services to help the team with whatever tasks were needed and to expedite approvals. For example, the temporary school located down the street needed additional work for the parking lot and stairs.   Within days, the project team prepared the requested documents and obtained the approval so that the relocation of the students stayed on-schedule. Red Barn prepared a queueing diagram along with signage for the temporary school facility down the street, prepared and obtained the demolition permits, coordinated directly with Frontier for fiber optic rerouting, and prepared and coordinated the SEPA application. Many of the tasks for the school required the team to be able to jump in, drop everything, and get the job done. Other reasons for success on this project, which has a total 18-month design & construction duration, include phasing the construction and have the shoring and excavation permits pulled prior to the building permit, and to work with the City staff in understanding the school's deadlines.

 

Red Barn Engineering Services

  • Deep infiltration system 

  • Erosion control

  • Paving 

  • Temporary excavation coordination 

  • Utility – water, sewer, and storm alignments 

  • ADA routing