© 2020 by Red Barn Engineering, Inc.

Salty's Pier Rehabilitation

Red Barn staff provided the environmental permitting support for the pier grouting in order to help the structure from settling.  Red Barn provided the material survey, stormwater analysis, and containment for the work.  The team worked with NOAA on site-specific regulations in order to focus the attention on the immediate repair of the pilings. 

This work was done by Annika Fain and Rebekah Weston.

Red Barn Engineering Services

  • Material Survey for the Structure

  • Stormwater Analysis

  • NOAA consultation